When cargo is oversized, overweight, or impossible to move by conventional means, the plan is everything. These case studies show how Mantoria engineers complex project cargo, heavy-lift, and out-of-gauge shipments across the globe, coordinating every leg from origin to final delivery so schedules hold, high-value equipment stays protected, and cargo arrives without damage.

The Heaviest Reactor Ever Lifted by Ship’s Gear

Mantoria managed the relocation of two oversized refinery reactors and 39 accessory units weighing more than 1,217 MT, including one reactor that became the heaviest unit ever lifted using ship’s gear in BBC Chartering’s history. The project also required continuous nitrogen monitoring to preserve reactor integrity throughout transportation and storage.

Door-to-Door OOG Steel Logistics from China to Quebec

Move three Out-of-Gauge (OOG) steel structures door-to-door from Qingdao, China to Quebec, Canada under a strict no-delay mandate, including a 4,750 km inland Canadian leg.

Engineered OOG Logistics for Time-Critical Canadian Mining

Mantoria managed the door-to-door transport of two extreme 26.7-meter Out-of-Gauge (OOG) crane girders from China to Canada under a “zero tolerance for delay” mandate.
” All in all, Mantoria is what all well managed enterprises seek when opting for third party business model relationship. “